News Flash Home
The original item was published from 9/20/2022 9:54:23 AM to 9/26/2022 3:50:14 PM.

News Flash

Dams

Posted on: September 22, 2022

[ARCHIVED] WINTER DRAW DOWN

Annual winter water level reduction is scheduled to begin Monday, October 17, 2022, on the Phillips Chain:  Long Lake, Wilson Lake, Elk Lake, Duroy Lake, and Musser Lake.  Weather pending, Long Lake, Wilson Creek Flowage, Elk Lake, Duroy Lake, Solberg Lake, and Musser Lake will be drawn down 8-10 inches by Thursday, October 20, 2022; and Sailor Creek Flowage and Prentice Flowage will be drawn down by 6 inches.  These overwinter drawdowns are done to prevent shoreline degradation, control aquatic invasives, and provide water storage capacity to mitigate spring flooding.   Levels will return to normal pool in the spring as the snow melts.

 

If you have any questions or concerns, please don’t hesitate to contact me at 715-492-4459 or contact the Highway Department’s main office at 715-339-3081 ext. 5.

 

Thank you

 

David Kempen

Dams Superintendent

 

Winter Drawdown PSA
Facebook Twitter Email

Other News in Dams